The Barkely Canyon TRF and node are installed and operational. It's sitting at a depth of about 646m at 48° 20.7536' N, 126° 09.4752' W.
Tomorrow, the Lodbrog will likely begin laying the extension cable leading from the node up to the site where our Vertical Profiler System
will be installed.
From the R/V Atlantis
, ROPOS
also surveyed the area where our benthic crawler
will be deployed. Uncharted hydrate mounds were discovered, and it's been decided to reroute the southern extension cable, which will provide power and communications to our benthic crawler in the Barkley Canyon hydrates
site and three benthic pods in Barkley Canyon. Plans call for this southern extension to be laid on Thursday.
(Click to enlarge.)
Labels: showcomments, hydrates, barkley-canyon, crawler, trf, ropos, trawl-resistant-frame, gas-hydrates