ODP 889 Installation
Last Changed by dwowens, 08-Sep-09 14:59
Labels: showcomments, odp-889, ropos, extension, deployment, trawl-resistant-frame, trf, thompson, bottom-pressure-recorder, node, cable, installation
Labels: showcomments, odp-889, ropos, extension, deployment, trawl-resistant-frame, trf, thompson, bottom-pressure-recorder, node, cable, installation
Before our port call in Esquimalt we made a quick trip to ODP 889, to lay an extension cable from the node to our study location and install an instrument platform and a bottom pressure recorder.
This platform will service two very exciting experiments, the Controlled Source Electro-Magnetic (CSEM) experiment and the Sea Floor Compliance (SFC) experiment. (See related news story
.)
All dive objectives were accomplished and we hope to test operation of the bottom pressure recorder this week.