Attached Files
| Name | Size | Creator | Creation Date | Comment | ||
|---|---|---|---|---|---|---|
| JPEG File barkley_extension_hose_spool_deploy... | 589 kB | dwowens | 15-Jul-09 23:17 | Lodbrog crew deploy a metal frame holding the coiled connector hose attached to the end of the northern extension cable. ROPOS will remove the hose from this frame when attaching to the node. Atlantis appears dimly in the distance, obscured by fog. | ||
| JPEG File capt_le_roux_watches_connector_hose... | 472 kB | dwowens | 15-Jul-09 23:27 | Lodbrog captain Jean Le Roux monitors the view from ROPOS as the extension cable connector hose (coiled on its deployment frame) is lowered to the seafloor next to the Barkley Canyon trawl-resistant frame. | ||
| JPEG File cables_in_lodbrog.jpg | 739 kB | dwowens | 15-Jul-09 22:23 | Cables in the Lodbrog's cavernous hold. The center structure holds ropes. Surrounding it, in the second ring, are the Barkley Canyon extension cables. | ||
| JPEG File barkley_node_extension_ports.jpg | 499 kB | dwowens | 15-Jul-09 22:24 | Connection ports on the Barkley Canyon node. The right and left dummy connectors shown here will be removed at the seafloor by ROPOS and replaced with wet-mate connectors at the ends of the extension cables. |